FEATURED CAMPUS

Pennsylvania Digital 1

Columbus Ohio

LOCATION: CARLISLE, PA (Middlesex Township)
STATUS: UNDER CONSTRUCTION
DELIVERY: Q4 2027

Pennsylvania Digital 1 (PAX-1) is a three-campus hyperscale data center development located on approximately 700 acres in Middlesex Township, Cumberland County, Pennsylvania. Designed to meet the growing demand for cloud computing and digital infrastructure, the project includes the construction of three data center campuses over four million square feet.

Each campus will include five to six purpose-built data center buildings supported by dedicated 450 MW electrical substations. The overall site will be anchored by a newly planned PPL 500 kV to 138 kV switching station, with delivery of 1.35 gigawatts (GW) of capacity with expandability up to 1.8 GW, comprising scale and speed for AI data center development.

The project’s architecture, landscaping, and overall site design have been thoughtfully planned to fit within the surrounding community and create the feel of a beautifully landscaped university campus.

The site has been designed to minimize land disturbance, preserve natural buffers and maintain setbacks from nearby properties. Existing vegetation, additional plantings, enhanced earthen berms, and landscaped screening have been incorporated into the design to reduce visual impacts from nearby roadways and surrounding areas.

  • PAX-1 Rendering 4

    Main entrance to Pennsylvania Digital 1 (PAX-1)

    RENDERING

  • PAX-1 Campus Rendering 1

    PAX–1 entrance along newly landscaped and upgraded Country Club Road

    RENDERING

  • PAX-1 Rendering 2

    PAX–1 internal road

    RENDERING

  • PAX-1 Rendering 5

    Secondary entrance from Country Club Road

    RENDERING

HIGHLIGHTS

FOOTPRINT

700-acre site, three campuses, 16 buildings over 4.5 million square feet of development.

Pennsylvania Digital I campus footprint
Campus utility capacity

UTILITY CAPACITY

1.35 GW, three dedicated substations, and a direct path to 1.8 GW for additional expansion.

Pennsylvania Digital I power delivery

POWER DELIVERY

Q4 2027: 450 MW

Q2 2028: 900 MW

Q2 2029: 1350 MW

Strategic location in the Northeast

STRATEGIC LOCATION

Located in the heart of the Northeast’s emerging AI corridor.

Campus robust fiber infrastructure

ROBUST FIBER INFRASTRUCTURE

Direct peering to Ashburn, VA and connectivity to 17 metro fiber providers.